Presentation, discussion, and possible action regarding an increase to the Housing Tax Credit amount for Preserve at Mustang Creek (HTC #23443)
end
RECOMMENDED ACTION
recommendation
WHEREAS, Preserve at Mustang Creek (the Development) received a 4% Housing Tax Credit (HTC) award in 2023 for the construction of 252 units for the general population in Round Rock, Williamson County;
WHEREAS, construction of the Development has been completed, and LSBD Round Rock 118, LLC (the Development Owner or Owner) requests, at cost certification, to increase the annual HTC amount from $2,562,616, the amount reflected in the Determination Notice, to $3,279,951, which was adjusted to $3,263,862 in the Department’s analysis;
WHEREAS, the adjusted HTC amount represents a 27.36% ($701,246) increase from the originally awarded HTC amount;
WHEREAS, §42(m)(2) of the Internal Revenue Code allows an increase of tax credits for a bond financed project when the increase is determined necessary as demonstrated through the submission of the cost certification package;
WHEREAS, 10 TAC §10.401(d) requires approval by the Board if an increase to the amount of tax credits exceeds 120% of the amount of credit reflected in the Determination Notice; and
WHEREAS, a review of the cost certification package submitted by the Development Owner supports the need for the additional tax credits requested, and staff has determined that the increase is necessary for the viability of the transaction;
NOW, therefore, it is hereby
RESOLVED, that the housing tax credit increase for Preserve at Mustang Creek from $2,562,616 to $3,263,862 is approved as presented to this meeting, and the Executive Director and his designees are each authorized, directed, and empowered to take all necessary action to effectuate the foregoing.
end
BACKGROUND
Preserve at Mustang Creek received a 4% HTC award in 2023 for the construction of 252 units for the general population in Round Rock, Williamson County. On July 19, 2023, a Determination Notice was issued with an approved annual tax credit amount of $2,562,616. The residential buildings in the Development placed in service between July 25, 2025, and September 30, 2025, and the cost certification documentation for the Development is currently under review by the Department.
In the cost certification package, the Development Owner requested an annual tax credit award of $3,279,951; however, after adjustments made in the Department’s analysis in accordance with Department’s rules, the recommended HTC amount is $3,263,862, which represents an increase of $701,246 (27.36%) from the amount reflected in the Determination Notice. The representative for the Development Owner explained that the Development incurred increased costs during construction. A comparison of the development costs from the time of the Application, in 2023, to Cost Certification indicates that total development costs increased $17,386,779 (23.58%), from $73,727,317 to $91,114,096.
In a letter dated October 7, 2026, William Boulay, representative for the Owner, explained that as construction progressed, the Development incurred additional costs associated with contractor performance issues and scope gaps; added and modified scopes of work resulting from unexpected City and County revisions; unforeseen site and utility conditions; modifications necessary to address code and accessibility requirements; and other construction-period changes. In addition, the construction schedule extended beyond the timeframe originally anticipated, resulting in increased construction-period interest and other financing costs. The increased construction costs also resulted in corresponding increases to applicable general contractor fees and the allowable developer fee.
Staff’s analysis of this transaction at cost certification has concluded that the Development supports an annual tax credit allocation of $3,263,862, and that the increase is necessary for the financial feasibility of the project and its viability as a qualified low-income housing project throughout the credit period. This results in a 27.36% increase from $2,562,616, the original annual HTC amount in the Determination Notice. In accordance with 10 TAC §10.401(d), Board approval is required because the requested tax credit amount exceeds 120% of the HTC amount reflected in the Determination Notice. The Development Owner will be required to submit the Tax-Exempt Bond Credit Increase Request Fee required in 10 TAC §11.901(8) for the increase to the HTC amount prior to issuance of Forms 8609. Additionally, all required pending documentation for the cost certification review must be provided for the issuance of 8609s.
Staff recommends approval of the increase in the tax credit award as presented herein.